Frost Brochure Issue 03 - Catalog - Page 71
Visit
frostdrainage.com
Call
01420 555572
Roof Drainage - Installation Guide
1. CHECK THE DIMENSIONS
Before installing, check the total
height of the components to ensure
the correct 昀椀nished level is achieved.
Allowance must be made for the
thickness of any membranes used and,
where applicable, roof insulation.
2. FIT SPIGOT AND CHECK
OUTLETS
Screw spigot, where required, into
the body, using a suitable sealant to
create a watertight joint. Position the
body in the roof deck and ensure the
outlet is accessible.
71