MuckStopper Brochure 2023 Q3 - Flipbook - Page 61
Case Study: Avtar Construction
Saving Time and Preventing Damage with the
MuckStopper IC 450 TPU
At the Persimmon Homes development in Warminster, Avtar
Construction faced the common challenge of protecting 450mm
inspection chambers during construction. Their usual method—
standard plastic covers topped with screwed-on Corex board—often
blew o昀昀, got damaged, and created unnecessary rework.
To streamline the process, they switched to the MuckStopper IC
450 TPU, a robust, high-vis temporary cover designed for real site
conditions. Lightweight yet durable, it 昀椀xes down once and protects
chambers right through to handover—no makeshift layers, no
repeated screwing and unscrewing.
By using the MuckStopper IC 450 TPU, Avtar Construction:
• Streamlined chamber protection with a single, easy-to-install
cover
• Prevented damage to 昀椀nal covers from plant or weather
• Saved time by eliminating repeated handling of covers
• Improved site presentation with a highly visible, professional
solution
• Ensured compliance and readiness for handover with no
surprises underground
The result is a cleaner, more controlled approach to chamber
protection—and another step forward in Avtar’s commitment to
quality and e昀케ciency on site.
bluejaysolutions.co.uk