SiteStak Brochure - Flipbook - Page 14
The original
drainage
workstation
Easy to move with
fork guides included
as standard and
optional lifting eyes
Supports 60%
of 6m pipe
length
Your company logo
and preferred paint
color for increased
brand awareness
Our most widely used workstation.
The original workstation when working
with 6m drainage pipes and 昀椀ttings.
2000+
14
sites (and growing)
using the SiteStak
system to change
groundworks for
good.
01420 559888